Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

Yo_Mama_Been_Loggin

(121,672 posts)
Wed Apr 9, 2025, 06:59 PM Apr 9

Open house offers peek into proposed Granite Falls bridge project

EVERETT — An open house on the proposed bridge replacement project for Granite Falls Bridge 102 will be held 5:30-7:30 p.m. Thursday at the Mountain Way Elementary gymnasium, 702 N Granite Ave., Granite Falls.

Granite Falls Bridge 102 spans the South Fork Stillaguamish River on Mountain Loop Highway 1.5 miles from downtown Granite Falls. At the open house, people will get a chance to view designs for the bridge and learn about next steps for the $28.7 million project set to begin construction in 2028.

Built in 1934, Granite Falls Bridge 102 is 340 feet long and 20 feet wide, which is not considered wide enough for two large vehicles to pass comfortably. The narrow bridge is also showing signs of age and deterioration. The proposed new structure will meet current bridge standards, widen lanes for motorists and bicyclists, add sidewalks for pedestrians and provide dedicated spaces for viewing the Stillaguamish River.

The existing bridge will remain open during construction, which is expected to be completed in 2029. To learn more and sign up for notifications, visit snohomishcountywa.gov/608.

https://www.heraldnet.com/news/open-house-offers-peek-into-proposed-granite-falls-bridge-project/

Latest Discussions»Region Forums»Washington»Open house offers peek in...